APC Smart-UPS SRT 5000VA 230V (SRT5KXLI) — Double-Conversion On-Line, Rack/Tower, Network Card

SRT5KXLI

Condition: NEW

Regular price
Dhs. 8,850.00(exc. Vat)
Regular price
(exc. Vat)
Sale price
Dhs. 8,850.00(exc. Vat)
Shipping calculated at checkout.
  • Hurry, only 1 item left in stock!
Live stock status

Confirm Availability & Best Price

This model is fulfilled through our verified supplier network. Message us for live stock status and pricing.

Enquire Now
Genuine Guarantee

Shop with Confidence: Authentic IT Products from Major Brands.

Shipping information

We offer FREE DELIVERY for order over AED 200. Also no additional Cash on Delivery (COD) fee.

Click here to know more

Returns information

No longer required or changed you mind ?

We have a 7 days return policy

Click here to know more

APC Smart-UPS SRT 5000VA 230V (SRT5KXLI) — Double-Conversion On-Line, Rack/Tower, Network Card
APC Smart-UPS SRT 5000VA 230V (SRT5KXLI) — Double-Conversion On-Line, Rack/Tower, Network Card
APC Smart-UPS SRT 5000VA 230V (SRT5KXLI) — Double-Conversion On-Line, Rack/Tower, Network Card

APC Smart-UPS On-Line · SRT Series

APC Smart-UPS SRT 5000VA 230V — On-Line, Rack/Tower

The SRT5KXLI is a 5000VA / 4500W double-conversion on-line UPS: it rebuilds the output waveform continuously rather than switching to battery, so the load never experiences a transfer. Pure sine wave at 230V, a 100–275V adjustable input range, internal automatic and manual bypass, and a Network Management Card 3 already fitted with a year of Secure NMC. Runtime scales with up to ten SRT192BP external battery packs. Built for servers and storage, voice and data networks, medical labs and light industrial loads across Dubai and the UAE, in rack or tower form.

Capacity
5000VA / 4500W
Output
230V, pure sine wave
Topology
Double-conversion on-line
Outlets
10 × IEC 60320 · 2 jumpers
Monitoring
Network Management Card 3

On-Line, Not Line-Interactive

Double conversion rebuilds the waveform continuously rather than switching to battery when the mains misbehaves, so the load never sees a transfer. That is what makes it suitable for medical labs and light industrial gear as well as servers, and it is the real difference from a Smart-UPS C or BX.

Runtime That Scales to Ten Packs

The internal batteries run on a 192V bus and recharge in about 1.5 hours. Up to ten SRT192BP external packs can be added when the load needs to ride out far more than a clean shutdown, so runtime is a purchasing decision rather than a fixed limit.

Network Card 3 Already Fitted

A Network Management Card 3 with environmental monitoring is pre-installed, with a one-year Secure NMC subscription included, plus serial, USB, emergency power off and one free SmartSlot. The UPS is manageable from the moment it is racked.

RangeAPC Smart-UPS On-Line (SRT)
Rated power5000 VA / 4500 W
Maximum configurable power5000 VA / 4500 W
UPS topologyOn-line, double conversion
Output voltage230 V, 1 phase (220 V / 240 V also supported)
Waveform typeSine wave
Output frequency50/60 Hz ± 3 Hz, sync to mains
Output connections6 × IEC 60320 · 4 × IEC 60320 · 2 × IEC jumpers
BypassInternal bypass, automatic and manual
Crest factor3 : 1
Harmonic distortionLess than 2%
Surge energy rating480 J
Input voltage230 V AC, 1 phase (220 V / 240 V also supported)
Input voltage range100–275 V adjustable (half load)
Input connectionHard wired, 3-wire (1P + N + E)
Input frequency40–70 Hz, auto-sensing
Battery typeLead-acid, internal, included
Battery voltage192 V
Included battery modules2
Typical recharge time1.5 hours
Battery charging power560 W rated
Expected battery life3 to 5 years
Replacement batteryAPCRBC140
Extendable runtimeYes — up to 10 × SRT192BP external battery packs
  • Network Management Card 3 with environmental monitoring, pre-installed
  • One-year Secure Network Management Card subscription included
  • Serial port and USB port
  • Emergency power off (EPO)
  • Audible and visible alarms, prioritised by severity
  • One free SmartSlot for a further management accessory
  • Temperature probe supplied in the box
Dimensions (H × W × D)432 × 130 × 719.4 mm
Weight54.43 kg
ColourBlack
MountingRack-mounted with included kit · rack/tower convertible
Packaging (H × W × L)330 × 960 × 610 mm
Packaged weight63.599 kg
Operating temperature0 to 40 °C
Storage temperature-15 to 45 °C
Relative humidity0–95%, non-condensing
Operating altitude0 to 10,000 ft
Acoustic level55 dBA
Heat dissipation931 BTU/h
IP protectionIP20
Product certificationsCE · EAC · IRAM · RCM · VDE
StandardsEN/IEC 62040-1:2019/A11:2021 · EN/IEC 62040-2:2006/AC:2006 · EN/IEC 62040-2:2018
Warranty36 months on the UPS · 24 months on the battery

Specifications from Schneider Electric’s product datasheet for the SRT5KXLI (se.com, UAE). The datasheet does not distinguish C13 from C19 among the ten IEC 60320 outlets, and no efficiency figure is quoted here because the published row could not be read unambiguously. Ask us and we will confirm either against the unit.

  • The input is HARD WIRED — 3-wire (1P + N + E), not a plug. Budget for an electrician to terminate it, and confirm the supply before delivery day.
  • It weighs 54.43 kg unboxed and 63.6 kg packaged. Plan a two-person lift and check the rack or floor position before it arrives.
  • Rack/tower convertible, but the rail kit (SRTRK2 or SRTRK3) is sold separately — it is not in the box.
  • Schneider’s datasheet lists the outlets as 6 × IEC 60320, 4 × IEC 60320 and 2 × IEC jumpers, without stating which are C13 and which are C19. Ask us to confirm against your PDU and cables before you order.
  • Double conversion means the load never sees a transfer, which is what sensitive medical and industrial equipment is usually specified against.
  • Runtime is a decision, not a limit — up to ten external battery packs can be added as the load or the expectation grows.
  • The network card is already fitted with a year of Secure NMC, so remote monitoring and alerts work from the day it is racked, with no extra purchase.
  • Internal automatic and manual bypass means the UPS can be serviced without dropping the load.
  • Schneider covers this model for 36 months on the UPS and 24 on the battery, longer than much of the APC range.
Servers and storage
Voice and data networks
Medical labs
Light industrial equipment

APC Replacement Battery Cartridge — APCRBC140

The correct replacement cartridge for this model. We supply, fit and recycle the old one across the UAE.

SRT192BP External Battery Pack

Adds runtime on the 192V bus. Up to ten can be fitted — tell us the runtime you need and we will work out how many.

Rail Kit — SRTRK2 or SRTRK3

Required to rack-mount the unit and sold separately. Send us your cabinet depth and we will confirm which kit fits.

Not sure which battery, rail kit or pack count you need? Send us the model on WhatsApp and we will confirm before you order.

Topology. The SRT is double-conversion on-line: it rebuilds the output waveform continuously, so the load never experiences a transfer when the mains dips or fails. A Smart-UPS C is line-interactive — very good, but it switches to battery. For medical lab equipment, light industrial gear and sensitive servers, on-line is the specification that is usually being asked for.

No. The SRT5KXLI input is hard wired, 3-wire (1P + N + E). It has to be terminated into the supply by an electrician rather than plugged into a socket, so factor that into installation. Tell us where it is going and we will flag what the site needs.

Runtime depends entirely on the load you put on it, so we would rather size it with you than quote a number. It is designed to extend: up to ten SRT192BP external battery packs can be added on the 192V bus. The internal batteries recharge in about 1.5 hours.

Yes. A Network Management Card 3 with environmental monitoring is pre-installed and a one-year Secure NMC subscription is included, so you get network monitoring, alerts and a temperature probe from day one. There is also serial, USB, emergency power off and one free SmartSlot.

Schneider states 36 months on the UPS and 24 months on the battery for this model. That is longer than the standard two years on much of the APC range, and worth knowing when comparing quotes. We handle registration and any claim locally.

Need sizing help?

Send us the watts your servers, storage and network draw and the runtime you need, and our UAE team will confirm the capacity, how many battery packs it takes and what the site needs for the hard-wired input.